High Speed 1 (HS1), officially known as the Channel Tunnel Rail Link (CTRL) and originally as the Union Railway or Continental Main Line (CML), is a Template:Convert high-speed railway between London and the United Kingdom end of the Channel Tunnel, through Kent.

The line was built to carry international passenger traffic between the United Kingdom and Continental Europe; additionally it carries domestic passenger traffic to and from towns and cities in Kent, and has the potential to carry Berne gauge freight traffic. The line, crossing over the River Medway and underneath the River Thames to London St Pancras railway station, opened in full on 14 November 2007.[1] It allows speeds of up to Template:Convert on section 1 and up to Template:Convert on section 2, and cost £5.8 billion to build.[2] There are intermediate stations at Stratford International, Ebbsfleet International and Ashford International.

International passenger services are currently provided by Eurostar, with journey times of London St Pancras to Paris Gare du Nord in 2 hours 15 minutes, and St Pancras to Brussels-South in 1 hour 51 minutes,[3] using a fleet of 27 Class 373/1 multi-system trains capable of Template:Convert. Other, competing, passenger operators are expected to use the line in the future. Domestic high-speed commuter services serving the intermediate stations and beyond began on 13 December 2009. The fleet of 29 Class 395 passenger trains are permitted to reach speeds of Template:Convert.[4] DB Schenker is running regular intermodal freight services on High Speed 1 using adapted Class 92 locomotives, enabling flat wagons carrying continental-size swap body containers to reach London for the first time.[5]

The CTRL project encompassed many new bridges and tunnels with a combined length nearly as long as the Channel Tunnel itself. During construction of the CTRL, significant archaeological research was undertaken.[6] In 2002, the CTRL project was awarded the "Major Project Award" at the British Construction Industry Awards.[7] The CTRL has seen periods of financial difficulty, and the line was transferred to government ownership in 2009, with a 30-year concession for its operation being put up for sale in June 2010.[8] The concession was awarded to a consortium of Borealis Infrastructure (part of Ontario Municipal Employees Retirement System) and Ontario Teachers' Pension Plan in November 2010,[9] but does not include the freehold or rights to any of the associated land.[10]

Early history[]

Template:Further A high-speed rail line, LGV Nord, has been in operation between the Channel Tunnel and the outskirts of Paris since the Tunnel's opening in 1994.[11] This has enabled Eurostar rail services to travel at Template:Convert for this part of their journey. A similar high-speed line in Belgium, from the French border to Brussels, HSL 1, opened in 1997.[12][13] However, in Britain, Eurostar trains had to run at a maximum of Template:Convert on existing tracks between London Waterloo and the Channel Tunnel.[14] These tracks were shared with local traffic, limiting the number of services that could be run, and jeopardising reliability.[15] The case for a high-speed line similar to the continental part of the route was recognised by policymakers,[16] and the construction of the line was authorised by Parliament with the Channel Tunnel Rail Link Act 1996,[17] which was amended by the Channel Tunnel Rail Link (Supplementary Provisions) Act 2008.[18][19]

An early plan conceived by British Rail in the early 1970s for a route passing through Tonbridge met considerable opposition on environmental and social grounds, especially from the Leigh Action Group and Surrey & Kent Action on Rail (SKAR). A committee was set up to examine the proposal under Sir Alexander Cairncross; but in due course environment minister Anthony Crosland announced that the project had been cancelled (see Hansard 20 January 1975), together with the plan for the tunnel itself.

The next plan for the Channel Tunnel Rail Link involved a tunnel reaching London from the south-east, and an underground terminus in the vicinity of Kings Cross station. However a late change in the plans, principally driven by the then Deputy Prime Minister Michael Heseltine's desire for urban regeneration in east London, led to a change of route, with the new line approaching London from the east. This opened the possibility of reusing the underused St Pancras station as the terminus, with access via the North London Line that crosses the throat of the station.[20]

The idea of using the North London line proved illusory, and it was rejected in 1994 by the then Transport Secretary, John MacGregor, as too difficult to construct and environmentally damaging.[21] However, the idea of using St Pancras station as the core of the new terminus was retained, albeit now linked by Template:Convert of specially built tunnels to Dagenham via Stratford.[20]

London and Continental Railways (LCR) was chosen by the UK government in 1996 to build the line and to reconstruct St Pancras station as its terminus, and to take over the British share of the Eurostar operation, Eurostar (UK). The original LCR consortium members were National Express Group, Virgin Group, S. G. Warburg & Co, Bechtel and London Electric.[22][23] While the project was under development by British Rail it was managed by Union Railways, which became a wholly owned subsidiary of LCR. On 14 November 2006, LCR adopted High Speed 1 as the brand name for the completed railway.[24] Official legislation, documentation and line-side signage, however, have continued to refer to "CTRL".

The project[]

As the 1987 Channel Tunnel Act made government funding for a Channel tunnel rail link unlawful,[25] construction did not take place as it was not financially viable. Construction was delayed until passage of the Channel Tunnel Rail Link Act 1996[17] which provided construction powers that ran for the following 10 years. The chief executive of the time Rob Holden stated that it was the "largest land acquisition programme since the Second World War".[26]

The whole route was to have been built as a single project, but in 1998 serious financial difficulties arose, and extensive changes came with a British government rescue plan.[27] To reduce risk, the line was split into two separate phases,[28] to be managed by Union Railways (South) and Union Railways (North). A recovery programme was agreed whereby LCR sold government-backed bonds worth £1.6 billion to pay for the construction of section 1, with the future of section 2 still not settled.

The original intention had been for the new railway, once completed, to be run by Union Railways as a separate line from the rest of the British railway network. However, as part of the 1998 rescue it was agreed that, following completion, section 1 would be purchased by Railtrack with an option to purchase section 2. In return, Railtrack was committed to operate the whole route as well as St Pancras railway station, which, unlike all other former British Rail stations, was transferred to LCR/Union Railways in 1996.[29]

In 2001, Railtrack announced that, due to its own financial problems, it would not undertake to purchase section 2,[30][31][32] triggering a second restructuring.[33] The 2002 plan agreed that the two sections would have different owners (Railtrack for section 1, LCR for section 2) but with common Railtrack management. Following further financial problems at Railtrack,[34] its interest was sold back to LCR, which then sold the operating rights for the completed line to Network Rail, Railtrack's successor.[35] Under this arrangement LCR became the sole owner of both sections of the CTRL and the St Pancras property, as per the original 1996 plan. Amendments were made in 2001 for the new station at Stratford International and connections to the West Coast Main Line.

As a consequence of the restructuring, in 2006 the LCR consortium consisted of construction firms Arup, Bechtel, Halcrow and Systra (which form Rail Link Engineering (RLE)); transport operators National Express Group and SNCF (which operates the Eurostar (UK) share of the Eurostar service with the National Railway Company of Belgium and British Airways); electricity company EDF; and UBS Investment Bank. On completion of section 1 by RLE, the line was handed over to Union Railways (South), which then handed it over to London & Continental Stations and Property (LCSP), the long-term owners of the line. Once section 2 of the line had been completed it was handed over to Union Railways (North), which handed it over to LCSP. The entire line, including St Pancras, is managed, operated and maintained by Network Rail (CTRL).

In February 2006 there were rumours that a 'third party' (believed to be a consortium headed by banker Sir Adrian Montague) had expressed an interest in buying out the present partners in the project.[36] LCR shareholders rejected the proposal,[37] and the government, which effectively could overrule shareholders' decisions as a result of LCR's reclassification as a state-owned body,[38] decided that discussions with shareholders would not take place imminently, effectively backing shareholders' views on the proposed takeover.[37]

By May 2009 LCR had become insolvent and the government received agreement to use state aid to purchase the line and also to open it up to competition to allow other services to use it apart from Eurostar.[39] LCR's hitherto wholly owned subsidiary, HS1 Ltd, thus became the property of the Secretary of State for Transport.[40] On 12 October 2009 a proposal was announced to sell £16 billion of state assets including HS1 Ltd in the following two years to cut UK public debt.[41] The government announced on 5 November 2010 that a concession to operate the line for 30 years had been sold for £2.1 billion to a consortium of Canadian investors.[9] Under the concession, HS1 Ltd has the rights to sell access to track and to the four international stations (St Pancras, Stratford, Ebbsfleet and Ashford) on a commercial basis, under the scrutiny of the Office of Rail Regulation. At the end of 30 years, ownership of the assets will revert to government.[40]

Route[]

File:Ctrl-testing-300kmh-Class-373-lab-car.jpg

Train 3313/3314 served as a laboratory train, reaching Template:Convert during Section 1 testing in 2003

File:Eurostar on CTRL.jpg

A Eurostar service on the CTRL, near Ashford

Template:Dablink The high-speed railway operates as a "seven-day railway", with full availability on all days. The line is closed for 40 minutes in the middle of the day shortly after noon for a "white period" (Template:Lang-fr) and "daylight inspection period". Any heavy maintenance is performed overnight.[42][43][44]Template:Rp Template:As of track access charges were capped at approximate £71.35 per minute. In 2008 the cost of running a train along the full length of the line between St Pancras and the Channel Tunnel was £2,244; with lower costs of £2,192 for a domestic service to Ashford International, or £1,044 for St Pancras to Ebbsfleet International.[44]Template:Rp A discounted rate of £4.00 per kilometre was made available for night-time-only railfreight operation until 31 March 2015.[45]

Section 1[]

Section 1 of the Channel Tunnel Rail Link, opened on 28 September 2003, is a Template:Convert section of high-speed track from the Channel Tunnel to Fawkham Junction in north Kent with a maximum speed of Template:Convert. Its completion cut the London–Paris journey time by around 21 minutes, to 2 hours 35 minutes. The line includes the Medway Viaduct, a 1.2 km (¾ mile) bridge over the River Medway and the North Downs Tunnel, a Template:Convert long, 12 m (40 ft) diameter tunnel. In safety testing on the section prior to opening, a new UK rail speed record of 334.7 km/h (208.0 mph) was set.[46] Much of the new line runs alongside the M2 and M20 motorways through Kent. After its completion, Eurostar trains continued to use suburban lines to enter London, arriving at Waterloo International.

There were a number of deaths of employees working on the CTRL over the construction period. One occurred on 28 March 2003 near Folkestone when a worker came into contact with the energised power supply.[47] Another death occurred two months later, in May 2003, when a scaffolder fell seven metres at Thurrock, Essex.[48] Three companies were found guilty of breaching health and safety legislation by omitting to provide barriers, resulting in Deverson Direct Ltd being ordered to pay a fine of £50,000, J Murphy and Sons Ltd £25,000, and Hochtief Aktiengesellschaft £25,000.[48] Two more deaths relate to a fire on board a train carrying wires, one mile (Template:Convert) inside a tunnel under the Thames between Swanscombe, Kent, and Thurrock, Essex on 16 August 2005. The train shunter died at the scene[49] and the train driver later died in hospital.[50] It has been suggested that a large amount of blame for accidents throughout the project lay with individual behaviour, becoming such a problem that an internal programme was launched to tackle behaviour problems during the construction.[51]

Unlike most LGV stations in France, the through tracks for Ashford International station are off to one side rather than going through, partly due to Ashford International predating the line.[52] High Speed 1 approaches Ashford International from the north in a cut-and-cover "box"; the southbound line rises out of this cutting and crosses over the main tracks to enter the station. The main tracks then rise out of the cutting and over a flyover. On leaving Ashford, southbound Eurostars return to the high-speed line by travelling under this flyover and joining from the outside. The international platforms at Ashford are supplied with both overhead 25 kV and 3rd rail 750V, avoiding the need to switch power supplies.

Section 2[]

File:KingsCrossDevelopmentModel.jpg

A model of the redeveloped King's Cross area. To the left is St Pancras Station

Section 2 of the project opened on 14 November 2007 and is a Template:Convert stretch of track from the newly built Ebbsfleet station in Kent to London St Pancras with a maximum speed of Template:Convert. Completion of the section cut journey times by a further 20 minutes (London–Paris in 2h 15m; London–Brussels in 1h 51m). The route starts with a Template:Convert tunnel which dives under the Thames on the edge of Swanscombe, then runs alongside the London, Tilbury and Southend Railway as far as Dagenham, where it enters a Template:Convert tunnel (Template:Coord), much of which is directly under the North London Line, before emerging over the East Coast Main Line near St Pancras. The tunnels are divided into London East and London West sections, between which a 1-kilometre stretch runs close to the surface to serve Stratford International and the Temple Mills Depot.

The new depot at Temple Mills, to the north of Stratford, replaced the North Pole depot in the west of London.[53] In testing, the first Eurostar train ran in St Pancras on 6 March 2007.[54] All CTRL connections are fully grade-separated. This is achieved through use of viaducts, bridges, cuttings and in one case, the tunnel portal itself.

Stations[]

Ashford International[]

File:Ctrl-testing-Descending off the Ashford flyover.jpg

A high-speed tunnel and flyover take non-stopping trains past Ashford International at Template:Convert

Main article: Ashford International railway station

This station was rebuilt as Ashford International during the early 1990s for international services from mainland Europe; this included the addition of two platforms to the north of station (the original down island platform had been taken over by international services). Unlike normal LGV stations in France, the through tracks for Ashford International railway station are off to one side rather than going through.[52] The number of services was reduced after the opening of the Ebbsfleet station. A high-speed domestic service operated by Southeastern to London St Pancras began on 29 June 2009.

Ebbsfleet International[]

Main article: Ebbsfleet International railway station

Ebbsfleet International railway station in the borough of Dartford, Kent is Template:Convert outside the eastern boundary of Greater London and opened to the public on 19 November 2007.[55] and is now Eurostar's main station in Kent.[56][57][58] Two of the platforms are designed for international passenger trains and four for high-speed domestic services.[59]

St Pancras International[]

Main article: St Pancras railway station
File:Eurostar trains at St Pancras.jpg

Eurostar trains at St Pancras International

The terminus for the high-speed line in London is St Pancras railway station. During the 2000s, towards the end of the construction of the CTRL, the entire station complex was renovated, expanded and rebranded as St Pancras International,[60][61] with a new security-sealed terminal area for Eurostar trains to continental Europe.[62] In addition, it retained traditional domestic connections to the north and south of England. The new extension doubled the length of the central platforms now used for Eurostar services; new platforms have been provided for existing domestic East Midlands Trains and the Southeastern high-speed services that run along High Speed 1 to Kent.[63] New platforms on the Thameslink line across London were built beneath the western margins of the station, and the station at King's Cross Thameslink was closed.

A complex junction has been built north of St Pancras with connections to the East Coast Main Line, North London Line (for West Coast Main Line) and Midland Main Line, allowing for a wide variety of potential destinations albeit on conventional rails. As part of the works, tunnels connecting the East Coast Main Line to the Thameslink route were also built in readiness for the forthcoming Thameslink Programme.

Stratford International[]

Main article: Stratford International railway station

Stratford International railway station was not part of the original government plans for the CTRL.[64] Completed in April 2006, it opened on 30 November 2009 when the domestic preview Southeastern highspeed services started calling there.[65] An extension of the Docklands Light Railway opened to Stratford International in August 2011.[66] It forms part of the complex of railway stations for the main site where the 2012 Summer Olympics were held.[67]

Temple Mills Depot in Leyton is used for storage and servicing of Eurostar trains and off peak berthing of Class 395 Southeastern high-speed trains.

Infrastructure[]

The railway is maintained from Singlewell Infrastructure Maintenance Depot. Access to the railway is protected by over one thousand Assa Abloy padlocks, with a hierarchical system of master keys.[68]

Track[]

Both track and signalling technology (TVM-430 + KVB) are based on or identical to the standards used on the French LGV high-speed lines. The areas around St Pancras and Gare du Nord use colour light and KVB signalling[69] with the whole of the high-speed route to Paris (CTRL, Channel Tunnel, LGV Nord) using TVM-430. Signalling tests before opening were performed by the SNCF-owned "Lucie" test car.[70]

The track is Template:RailGauge[71] cleared to a larger modern European GC loading gauge[71] enabling GC gauge freight as far as the yards at Barking.[72][73] The line is electrified entirely using overhead lines with 25 kV AC railway electrification.

Tunnels[]

After local protests,[74][75] early plans were modified to put more of the route into tunnels up until a point approximately Template:Convert from St. Pancras, previously the CTRL was planned to run on an elevated section alongside the North London Line on approach into the line's terminus. The twin tunnels bored under London were driven from Stratford westwards towards St Pancras, eastwards towards Dagenham and from Dagenham westwards to connect with the tunnel from Stratford. The tunnel boring machines were 120 metres long and weighed 1,100 tonnes. The depth of the tunnels vary from a depth of 24 metres to 50 metres.

The construction works were complex and a large number of contractors were involved in delivering them.[76] The CTRL Section 2 construction works had caused considerable disruption around the Kings Cross area of London, however in their wake redevelopment was stimulated.[77][78] The huge redevelopment area includes the run-down areas of post-industrial and ex-railway land close to King's Cross and St Pancras, a conservation area with many listed buildings; this was promoted as one of the benefits for building the CTRL.[79] However it has been postulated that this development was actually suppressed by the construction project,[80] and some of the affected districts are still in a poor state.[81]

Connection line to Waterloo[]

A Template:Convert connecting line providing access for Waterloo railway station leaves High Speed 1 at Southfleet Junction using a grade-separated junction; the main CTRL tracks continue uninterrupted through to CTRL Section 2 underneath the southbound flyover. The connection joins the Chatham Main Line at Fawkham Junction with a flat crossing. The retention of Eurostar services to Waterloo after the line to St Pancras opened was ruled out on cost grounds.[82] Waterloo International closed upon opening of the section two of the CTRL in November 2007; Eurostar now serves the refurbished St Pancras as its only London terminal, so this connecting line is no longer used in regular service.[83][84]

Services[]

High Speed 1 was built to allow eight trains per hour through to the Channel Tunnel.[85] As of December 2010, Eurostar runs one or two trains per hour through to the Channel Tunnel.[86] Southeastern has in the high peak eight trains per hour between London and Ebbsfleet, two of these continuing on to Ashford.[87] During the 2012 Olympic Games Southeastern provided the Olympic Javelin service with up to twelve trains per hour from Stratford into London.[88]

Freight[]

The route was built with freight provision from the beginning. It has spurs leading to and from the freight terminal at Dollands Moor (Folkestone) and the freight depot at Barking (Ripple Lane), north of the River Thames. Long passing loops to hold freight trains while passenger trains overtake them were built at Lenham Heath and Singlewell.

Freight trains operated by EWS first ran over CTRL Section 1, on the consecutive evenings of 3–4 April 2004. Five freight trains that would have run via the classic lines were diverted to run over the Channel Tunnel Rail Link instead: three southbound intermodal trains on 3 April 2004 and two northbound intermodal trains on 4 April 2004.[89]

Operators[]

The railway is operated on an open access basis. Trains are operated by several different organisations all operating over the same track. HS1 Ltd. is the network manager for the line, stations, and other infrastructure.[90]

Network Rail (High Speed) Ltd[]

HS1 Ltd is responsible for overall managing and running of the line—along with the international railway stations at St Pancras, Stratford, Ashford and Ebbsfleet[91]—with responsibility for the infrastructure itself sub-contracted to Network Rail (High Speed) Ltd (formerly known as Network Rail (CTRL) acting as the controller and infrastructure manager.[92] Network Rail (CTRL) Limited was created as a subsidiary of Network Rail on 26 September 2003 for £57 million to take over the assets of the CTRL renewal and maintenance operations.[93] Network Rail (High Speed) operates a number of engineering, track maintenance machines, rescue locomotives, and infrastructure- and test trains.[94] Eurotunnel's subsidiary Europorte 2 operates its Eurotunnel Class 0001 (Krupp/MaK 6400) rescue locomotives on the line when required.[95]

Various track recording trains run as necessary, including visits by the New Measurement Train. On the night of 4/5 May 2011 the SNCF TGV Iris 320 laboratory train took over, being hauled from Coquolles to St Pancras and back, towed by Eurotunnel Krupp locomotives numbers 4 and 5.[96] The Iris 320 runs for Network Rail (High Speed) are an extension of the Template:Convert monitoring cycle already undertaken by SNCF International since December 2010 for Eurotunnel every two months.[97][98]

Eurostar[]

File:StroodCTRL2.JPG

A Eurostar train passing Strood, on approach to the Medway bridge

Main article: Eurostar

The Eurostar service uses about 40% of the capacity of High Speed 1,[99] which in November 2007 became the company's route for all its services.[100] Eurostar trains are for international traffic only, passing along the high-speed line from London St Pancras railway station to the Channel Tunnel, with the majority[101] terminating at either Paris Gare du Nord in France or Brussels-South railway station in Belgium.[102][103] Currently the trains operated by Eurostar are the only ones to make full use of the high speeds on the line; a Eurostar train was used to set a new British rail speed record of Template:Convert on 30 July 2003.[104][105] The British component of Eurostar is owned by London and Continental Railways, which also owns High Speed 1 and the infrastructure on it.[106]

On 4 September 2007, a train travelled from Paris Gare du Nord to St Pancras in 2 hours 3 minutes and 39 seconds.[107] On 19 September 2007, a train travelled from Brussels South to St. Pancras in 1 hour 43 minutes.[108]

 Class  Image  Type   Top speed   Number   Routes operated   Built 
 mph  km/h 
Class 373 Eurostar File:Eurostar at St Pancras railway station.jpg Electric multiple unit 186 300 28 LondonParis
London–Brussels
London–Marne-la-Vallée – Chessy
London–Avignon Centre
London–Bourg Saint Maurice
1992-1996

Southeastern[]

File:Class 395 Javelin STP 003.jpg

A Southeastern Class 395 train departing from London St Pancras railway station on a preview domestic service

Main article: Southeastern (train operating company)

Domestic high-speed services on High Speed 1 are operated by Southeastern. Having been in planning since 2004,[109] a preview service of the British Rail Class 395 trains, popularly known as Javelins, started in June 2009,[59] and regular services began on 13 December 2009. The quickest journey time from Ashford to London St Pancras is 35 minutes,[110] compared with 60 minutes for the service to London Charing Cross via Tonbridge.[111] This service on Section 2 of the CTRL, known previously as CTRL-DS, was a factor in London's successful 2012 Olympic Bid, promising a seven-minute journey time from the Olympic Park at Stratford to the London terminus at St Pancras.[112] Although the Class 395 has a maximum speed of Template:Convert, for timetabling purposes a 10% lower speed is assumed.[113] However, these trains have faster acceleration than the Eurostar units.[114]

 Class  Image  Type   Top speed   Number   Routes operated   Built 
 mph  km/h 
Class 395 Javelin File:Class 395 Javelin STP 001.jpg Electric multiple unit 140 225 29 St PancrasStratford International-
Ebbsfleet International-Ashford International-Ramsgate/ Dover Priory.[115]
Maidstone West-Strood-Gravesend-St Pancras[116]
2007-2009

DB Schenker[]

File:Class-92-db-red-92009-dollands-moor-1.jpg

DBS Class 92s haul freights over High Speed 1

File:Class373-eurostar-north-downs-tunnel-high-speed-1-telephoto.jpg

North Downs Tunnel, northern portal under Blue Bell Hill

Main article: DB Schenker Rail (UK)

DB Schenker is a global freight operator with a large interest in freight over rail in Europe.[117] While High Speed 1 was constructed with freight loops, no freight traffic had run upon the line since opening in 2003.[118] On 16 April 2009 DB Schenker signed an agreement with HS1 Ltd, the owner of High Speed 1, for a partnership to develop TVM modifications for class 92 freight locomotives to run on the line.[119] On 25 March 2011 for the first time a modified class 92 locomotive travelled from Dollands Moor to Singlewell using the TVM430 signalling system.[120] A loaded container train ran for the first time on 27 May 2011, to Novara in Italy. Following further trials with loaded wagons[121][122] DB is to upgrade five Class 92 locomotives to allow them to run on High Speed 1.[123] From 11 November 2011 a weekly service using European-sized swap body containers has run between London and Poland using High Speed 1.

 Class  Image  Type   Top speed   Number   Built   Notes 
 mph  km/h 
Class 92 File:92027 George Eliot at Stafford.jpg Electric locomotive 87 140 46 1993-1996 92009, 92015, 92016, 92031, 92042 to be converted for High Speed 1 usage with the necessary TVM modifications.[124]

Future operations[]

At present, only Deutsche Bahn has applied for use of the line and in 2009 regulations were relaxed to allow its trains to use the Channel Tunnel. Other proposals are yet to be formalised.

Deutsche Bahn[]

File:SiemensVelaroD-InnoTrans2010.jpg

Deutsche Bahn is planning services using Siemens Velaro D trains. A sixteen-car version has been ordered by Eurostar

In November 2007, it was reported that Deutsche Bahn, Germany's national train company, had applied to use the Channel Tunnel and High Speed 1 into London.[125] This was denied by Deutsche Bahn, and the bi-national Channel Tunnel Safety Authority confirmed that it had not received such an application.[126] The plan was delayed by safety regulations as Deutsche Bahn's fleet of ICE 3M high-speed trains could not be divided in the tunnel in an emergency.[127]

In December 2008, it was reported that Deutsche Bahn (DB) was interested in buying the British share in Eurostar,[128] which in practice means buying Eurostar (U.K.) Ltd., the 100% subsidiary of London and Continental Railways (LCR), which the British government intends to break up and sell just as it does the other rail-related subsidiary of L&CR, HS1 Ltd.[129][130] The buyer of EUKL would become the owner of the 11 British "Three Capitals" Class 373 trainsets plus all seven "North of London" sets, and would also be responsible for the operations of Eurostar traffic within Britain once the management contract with ICRR expires in 2010. Guillaume Pépy, the president of SNCF, who held a press conference the same day, described DB's interest as "premature, presumptuous and arrogant".[131] SNCF claims to own 62% of the shares of Eurostar Group Ltd. Hartmut Mehdorn, former CEO of Deutsche Bahn, confirmed DB's interest but insisted in a letter to Pépy that DB had only informally requested information and not made any official requests to Britain's Department for Transport.[132]

In 2009, Eurotunnel (the owners of the Channel Tunnel) announced that it was prepared to start relaxing the fire safety regulations, in order to permit other operators, such as Deutsche Bahn, to transport passengers via the Tunnel using other forms of rolling stock.[133] Under the deregulation of European railway service, high-speed lines were opened up to access by other operators on 1 January 2010; the Inter-Governmental Commission on the Channel Tunnel (IGC) announced that it was considering relaxing the safety requirements concerning train splitting. LCR suggested that high-speed rail services between London and Cologne could commence before the 2012 Olympics.[134]

In March 2010 Eurotunnel, HS1 Ltd, DB and other interested train operators formed a working group to discuss changes to the safety rules, including allowing 200-metre trains. The Intergovernmental Commission currently requires trains to be 400m long.[135] Deutsche Bahn carried out evacuation trials in the tunnel on 17 October 2010 with two 200m-long ICE3 trains, and displayed one of them at St Pancras station on 19 October.[136] The current Velaro ICE3 sets do not meet the fire safety requirements for passenger services through the tunnel, but the Siemens Velaro D sets on order include the necessary additional fire-proofing.[137] In March 2011, the European Rail Agency decided to allow trains with distributed traction to operate in the Channel Tunnel.[138] DB is planning three services a day to Frankfurt (5h from London), Rotterdam (3h) and Amsterdam (4h) via Brussels[136][139] from 2015. This had originally planned to be 2013, but has been delayed due to the availability of the Channel Tunnel version of the Siemens Velaro D trains.[140]

As of 2016, nothing yet has come to fruition, but the High Speed One website continues to state that "HS1 Ltd are working with Deutsche Bahn on plans to incorporate three additional international return journeys, between Frankfurt and London via Cologne, Brussels and Lille. This will include connections from Amsterdam via Rotterdam to London."

In March 2017 it was announced that Deutsche Bahn had revived plans for a London to Frankfurt train service with the service beginning as early as 2020. The service would take around 5 hours and could rival airlines and become the first competitor for Eurostar. However, in June 2018, Deutsche Bahn stated the plans have been shelved due to a "significantly changed economic environment"

File:Alstom AGV Cerhenice img 0365.jpg

Veolia's planned use of the AGV train would cut journey times to London

Veolia[]

In September 2008, Air France-KLM indicated a desire to take advantage of the change in the law and apply to run rail services, in cooperation with Veolia, from London to Paris and from Paris to Amsterdam, in competition with Eurostar and Thalys respectively, with the intention of purchasing or leasing a number of the new AGV multiple units currently being tested.[141][142] However, in October 2009 Air France withdrew its interest. This led to Veolia looking for new partners, with the announcement that it would begin working on new proposals in cooperation with Trenitalia to run services from Paris to Strasbourg, London and Brussels.[143]

Renfe[]

File:Talgo 350.jpg

Spanish AVE train

Spanish railway operator RENFE has also shown an interest in running AVE services from Spain to London[144] via Paris, Lyon, Barcelona, Madrid and Lisbon (using the Madrid–Barcelona high-speed rail line) once its AVE network is connected to France via the Barcelona to Figueras and Perpignan to Figueras lines in 2012.[145]

Getlink[]

In August 2018, Bloomberg Businessweek reported that Getlink is interested in setting up an Ouigo-style low cost high speed rail service between London and Paris, travelling between the railway stations of Stratford International and Charles-de-Gaulle.

Services to Bordeaux[]

It was revealed in March 2020 that High Speed 1 Ltd, along with SNCF and Lisea, are looking for an operator for a future London St Pancras-Bordeaux St Jean train service.

Transmanche Metro[]

In February 2010, local councillors from Kent and Pas-de-Calais announced they were in talks to establish a frequent local rail service between the regional stations along the route. Trains would leave Lille and stop at Calais, Ashford and Stratford before reaching London St. Pancras. Currently, Ashford and Calais have an infrequent service and Eurostar trains do not call at Stratford. The initiative is part of Calais' branding as part of the UK in order to benefit from the 2012 London Olympics but is supported on both sides of the channel to bring in more commuters.[146]

See also[]

References[]

  1. Script error: No such module "citation/CS1".
  2. Script error: No such module "citation/CS1".
  3. Template:Cite press release
  4. Script error: No such module "citation/CS1".
  5. Script error: No such module "citation/CS1".
  6. Template:Cite book
  7. Script error: No such module "citation/CS1".
  8. Script error: No such module "citation/CS1".
  9. 9.0 9.1 Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".
  11. Script error: No such module "citation/CS1".
  12. Template:Cite press release
  13. Script error: No such module "citation/CS1".
  14. Script error: No such module "citation/CS1".
  15. Script error: No such module "citation/CS1".
  16. Script error: No such module "citation/CS1".
  17. 17.0 17.1 Script error: No such module "citation/CS1".
  18. Script error: No such module "citation/CS1".
  19. Script error: No such module "citation/CS1".
  20. 20.0 20.1 Script error: No such module "citation/CS1".
  21. Script error: No such module "citation/CS1".
  22. Script error: No such module "citation/CS1". Template:Dead link Template:Subscription
  23. Script error: No such module "citation/CS1".
  24. Script error: No such module "citation/CS1".
  25. Script error: No such module "citation/CS1".
  26. Script error: No such module "citation/CS1".
  27. Script error: No such module "citation/CS1".
  28. Template:Cite press release
  29. Script error: No such module "citation/CS1".
  30. Script error: No such module "citation/CS1".
  31. Script error: No such module "citation/CS1".
  32. Script error: No such module "citation/CS1".
  33. Script error: No such module "citation/CS1".
  34. Script error: No such module "citation/CS1".
  35. Script error: No such module "citation/CS1".
  36. Script error: No such module "citation/CS1".Template:Subscription required
  37. 37.0 37.1 Script error: No such module "citation/CS1".
  38. Script error: No such module "citation/CS1".
  39. Script error: No such module "citation/CS1".
  40. 40.0 40.1 Script error: No such module "citation/CS1".
  41. Script error: No such module "citation/CS1".
  42. Template:Cite report
  43. Script error: No such module "citation/CS1".
  44. 44.0 44.1 Script error: No such module "citation/CS1".
  45. Script error: No such module "citation/CS1".
  46. Script error: No such module "citation/CS1".
  47. Script error: No such module "citation/CS1".
  48. 48.0 48.1 Script error: No such module "citation/CS1".
  49. Script error: No such module "citation/CS1".
  50. Script error: No such module "citation/CS1".
  51. Script error: No such module "citation/CS1".
  52. 52.0 52.1 Template:Cite press release
  53. Script error: No such module "citation/CS1".
  54. Script error: No such module "citation/CS1".
  55. Script error: No such module "citation/CS1".
  56. Script error: No such module "citation/CS1". Template:Dead link
  57. Script error: No such module "citation/CS1".
  58. Script error: No such module "citation/CS1".
  59. 59.0 59.1 Script error: No such module "citation/CS1".
  60. Official name of the station according to the Department of Transport, released in response to a Freedom of Information Act request at Whatdotheyknow.com. Retrieved 2 December 2008.
  61. Official name of the station according to the London Borough of Camden released in response to a Freedom of Information Act request at Whatdotheyknow.com. Retrieved 2 December 2008.
  62. Script error: No such module "citation/CS1".
  63. Script error: No such module "citation/CS1".
  64. Script error: No such module "citation/CS1".
  65. Script error: No such module "citation/CS1".
  66. Script error: No such module "citation/CS1". Template:Dead link
  67. Script error: No such module "citation/CS1".
  68. Script error: No such module "citation/CS1".
  69. Script error: No such module "citation/CS1".
  70. Script error: No such module "citation/CS1".
  71. 71.0 71.1 Script error: No such module "citation/CS1".
  72. Script error: No such module "citation/CS1".
  73. Script error: No such module "citation/CS1".
  74. Script error: No such module "citation/CS1".
  75. Script error: No such module "citation/CS1".
  76. Script error: No such module "citation/CS1".
  77. Script error: No such module "citation/CS1".
  78. Script error: No such module "citation/CS1".
  79. Script error: No such module "citation/CS1".
  80. Script error: No such module "citation/CS1".
  81. Script error: No such module "citation/CS1".
  82. Script error: No such module "citation/CS1".
  83. Script error: No such module "citation/CS1".
  84. Script error: No such module "citation/CS1".
  85. High Speed 1, United Kingdom, Railway Technology
  86. Timetable Core destinations from 12 December 2010 to 2 July 2011, Eurostar
  87. Script error: No such module "citation/CS1".
  88. Template:Cite book
  89. Template:Cite press release
  90. Template:Citation
  91. Script error: No such module "citation/CS1".
  92. Script error: No such module "citation/CS1".
  93. Template:Cite report
  94. Script error: No such module "citation/CS1".
  95. Script error: No such module "citation/CS1".
  96. Template:Cite journal
  97. Script error: No such module "citation/CS1".
  98. Template:Cite report
  99. Script error: No such module "citation/CS1".
  100. Script error: No such module "citation/CS1".
  101. Script error: No such module "citation/CS1".
  102. Script error: No such module "citation/CS1".
  103. Official Waterloo 'Goodbye' video, useful statistics and numbers shown
  104. Template:Cite press release
  105. Template:Cite journal
  106. Template:Cite press release
  107. Script error: No such module "citation/CS1".
  108. Script error: No such module "citation/CS1".
  109. Script error: No such module "citation/CS1".
  110. Script error: No such module "citation/CS1".
  111. Script error: No such module "citation/CS1".
  112. Script error: No such module "citation/CS1".
  113. Script error: No such module "citation/CS1".
  114. Script error: No such module "citation/CS1".
  115. Template:Cite press release
  116. Script error: No such module "citation/CS1".
  117. Script error: No such module "citation/CS1".
  118. Script error: No such module "citation/CS1".
  119. Script error: No such module "citation/CS1".
  120. Template:Cite press release
  121. Template:Cite press release
  122. Script error: No such module "citation/CS1".
  123. Script error: No such module "citation/CS1".
  124. Class 92 09/11/12 - wnxx.com (Retrieved 8 January 2013)
  125. Script error: No such module "citation/CS1".
  126. Script error: No such module "citation/CS1".
  127. Script error: No such module "citation/CS1".
  128. Script error: No such module "citation/CS1".
  129. Script error: No such module "citation/CS1".
  130. London & Continental Railways - scroll down to section "About the future".
  131. Script error: No such module "citation/CS1". Template:Dead link
  132. Script error: No such module "citation/CS1".
  133. Script error: No such module "citation/CS1".
  134. Script error: No such module "citation/CS1".
  135. Script error: No such module "citation/CS1".
  136. 136.0 136.1 Script error: No such module "citation/CS1".
  137. Script error: No such module "citation/CS1".
  138. Template:Cite press release
  139. Script error: No such module "citation/CS1".
  140. Script error: No such module "citation/CS1".
  141. Script error: No such module "citation/CS1".
  142. Script error: No such module "citation/CS1".
  143. "Veoila and Trenitalia mount rival Eurostar service", Breaking Travel News, 24 December 2009.
  144. Script error: No such module "citation/CS1". Template:Dead link
  145. Script error: No such module "citation/CS1".
  146. Script error: No such module "citation/CS1".

Bibliography[]

  • Template:Cite book
  • Template:Cite book
  • Template:Cite book
  • Template:Cite book
  • Template:Cite book

Further reading[]

  • Template:Cite book
  • Template:Cite book
  • Template:Cite book
  • Template:Cite book
  • Template:Cite book
  • Template:Cite book
  • Template:Cite book
  • Template:Cite book

External links[]

Template:Commons category

Template:Coord

Template:ThamesCrossings Template:TGV navbox Template:Eurostar navbox Template:Channel tunnel Template:High-speed railway lines Template:Main inter-regional railway lines in Great Britain Template:Railway lines in London Template:Railway lines in the East of England Template:Railway lines in South East England Template:Rail network infrastructure companies

Template:Use dmy dates

Advertisement