The history of the Mass Rapid Transit system of Singapore commences with its planning in the 1960s, leading to its opening in 1987 with the launch of the 6 km section of the North South Line from Yio Chu Kang to Toa Payoh. It now has 4 lines in operation with a total combined route length of Template:Convert and 102 stations. The Light Rail Transit which opened in 1999 acts as a feeder service to the MRT network.

Construction of backbone network

Conceptualisation

The idea of constructing a rapid transit line in the country was initiated in 1967, when a four-year State and City Planning study conducted by the Singapore government and the United Nations Development Programme. It was part of an urban renewal and development project which aimed to formulate a long-term comprehensive concept plan for guiding the country's future physical development. It was concluded that physical land constraints faced by the island nation, was not able to accommodate more roads to meet the rise in transportation demands. It was noted that the city state needed a rail transit system by 1992.[1]

Bus vs. rail debate

It took 10 years since 1972 to design the MRT system, which continued all the way until the government gave permission to build the MRT.

In 1972, a team of consultants and professional officers seconded from the government embarked on a major transport study known as the Singapore Mass Transit Study. In phase one of the study, the team examined existing and future transport demands, analysed various options and made recommendations for government investment in public transportation. The team recommended the rail mass transit as the best option for meeting the anticipated travel demands of Singapore. The railways which are parallel to the roads that they are examined include:

  • Bukit Timah Line, which goes from Bugis, via Bukit Timah Road, Upper Bukit Timah Road, Woodlands Road to Johor Bahru
  • Changi Line, which goes from City Hall, via Victoria Street, Kallang Road, Geylang Road, Changi Road, Upper Changi Road to Changi Point
  • East Coast Line, which goes from City Hall, via Nicoll Highway, Mountbatten Road, East Coast Road, Upper East Coast Road to Bedok Corner
  • Serangoon Line, which goes from Dhoby Ghaut, via Little India, Serangoon Road, Upper Serangoon Road, Punggol Road to Punggol Road End
  • Thomson Line, which goes from Bugis, via Bukit Timah Road, Thomson Road, Upper Thomson Road, Sembawang Road to Sembawang Road End
  • West Coast Line, which goes from City Hall, via Raffles Place, Tanjong Pagar, Telok Blangah Road, Pasir Panjang Road, West Coast Road, Jurong Town Hall Road, Jurong Road and Upper Jurong Road to Tuas Village.

Phase One (1972-74) examined the costs and benefits of five alternative mass rapid concepts, including an all-bus system. It recommended that Singapore’s overall objectives could be best achieved with a rail-based system combined with a complimentary bus network.

Phase two of the study, which commenced in 1975, examined the technical, economic and financial feasibility of the mass transit system. This study argued that a bus-rail system was a “superior alternative” to an all-bus system, with only a remote chance of a disastrous result. Phase Two (1975-78) confirmed that a rail system operating through the most densely-populated areas would be economically and technically feasible. It also recommended a basic route: two operationally-separate lines running east-west and north-south through the City Centre, therefore shortlisted form all the six.

Despite the study’s recommendation for the development of a MRT system, the high costs involved and the possible impact on patterns of land use and economic activities prevented the government from making an immediate decision. The issue was complicated by a review of the phase two study by a team from the World Bank. The World Bank team had issues with the Singapore team’s costing and assessment of the relative benefits of the bus-rail plan compared to an all-bus system.

Phase three of the study was conducted between 1979 and 1980, and provided a preliminary engineering design for the recommended transit system. In 1980, a Provisional Mass Rapid Transit Authority was appointed to undertake preparatory work for the construction of a possible MRT system.

Despite the findings of the mass transit studies, the government was still hesitant to commit to the MRT system. A team of foreign consultants (also known as the Harvard team) led by team leader Kenneth Hansen was engaged to review the previous mass transit and other transportation studies.

In their report, the Hansen team argued that the earlier studies were based on incorrect assumptions and thus failed to consider other approaches to solve Singapore’s transport problems. Rather than a MRT system, the Hansen team recommended a high performance all-bus system coupled with feeder routes and motorcar restraint. Even if Singapore were to develop a MRT system, the team suggested that only one line be built as they believed that this would be sufficient to relieve traffic congestion and allow the bus system to function.

When Ong Teng Cheong became the then-Minister for Communications (now the Ministry of Transport), he had to convince the cabinet in a debate in early 1980, that the S$ 5 billion needed for the system would be beneficial for the long-term development of Singapore. He argued that

"this is going to be the most expensive single project to be undertaken in Singapore. The last thing that we want to do is to squander away our hard-earned reserves and leave behind enormous debt for our children and our grandchildren. Now since we are sure that this is not going to be the case, we'll proceed with the MRT, and the MRT will usher in a new phase in Singapore's development and bring about a better life for all of us."

Therefore, a provisional Mass Rapid Transit Authority was established in July 1980, after the debate. However, Mr Ong faced strong opposition from other members of the cabinet, by Finance Minister Goh Keng Swee, due especially to the heavy investments involved. A team of specialists from Harvard University, recommended that an all-bus system would be sufficient into the 1990s, and would cost 50% less than a rail-based system.

Later on, two independent American transport and urban planning specialist teams were then appointed by the government to conduct their own independent reviews as part of the Comprehensive Traffic Study in 1981. This debate was also brought to national television in September 1980, which was rare at that time. The study came to a conclusion that an all-bus system would be inadequate as it would have to compete for road space which would have been increasingly overcrowded by then. The problem would be solved by building a rail system. Mr Ong hence declared in triumph on 28 March 1982, that

"the Government has now taken a firm decision to build the MRT. The MRT is much more than a transport investment, and must be viewed in its wider economic perspective. The boost it'll provide to long term investors' confidence, the multiplier effect and how MRT will lead to the enhancement of the intrinsic value of Singapore's real estate are spin-offs that cannot be ignored."

Construction begins

The permission to begin the construction of Singapore's then-largest public works project was given in May 1982. A ground-breaking ceremony commenced the construction on 22 October 1983 at Shan Road. The majority of the work was expected to be completed in 1992. This included 67 km of track to be constructed, with 42 stations, of which 26 would be elevated, 1 at grade and 15 underground. The network was constructed in stages, with the North South Line given priority as the line passed through the Orchard Road corridor as well as the Central Area, both of which faced a high demand for public transport. Also, it was near the more densely populated housing estates such as Toa Payoh and Ang Mo Kio. The MRT Corporation, now Land Transport Authority, was established on 14 October 1983, taking over the roles and responsibilities of the former provisional Mass Rapid Transit Authority. On 6 August 1987, it set up SMRT Corporation.

Initial opening

On 7 November 1987, the first 6 kilometres of the North South Line from Yio Chu Kang to Toa Payoh went into operation. The novelty resulted in thousands flocking to the 5 station segment of the line just to experience and try out the system. At the launching of Toa Payoh, the late Mr Ong was quoted as saying that

"this is like a 20-year affair from conception to delivery. Now the baby is born, to say that I am happy and pleased is an understatement."

Nine more stations from Novena to Outram Park were officially opened 12 December 1987 by then Deputy Prime Minister Goh Chok Tong. These trains ran as a through service from one end to the other even though Tanjong Pagar and Outram Park were on the East West Line.

On 12 March 1988, with the opening of six more stations from Tiong Bahru to Clementi on the East West Line, City Hall and Raffles Place become interchange stations between the two lines. On the same day, the system was officially launched by Mr Lee Kuan Yew, then Prime Minister of Singapore.

File:OpeningMRT.jpg

The late President Ong Teng Cheong (in beige suit) inaugurating the Opening Ceremony of the Singapore Mass Rapid Transit system on 7 November 1987.

Nearing completion

The rest of the system opened rapidly in stages.

Subsequent expansions

North South Line Woodlands Extension

File:Ns9woodlands.jpg

Woodlands is a station built part of the Woodlands Extension together with Woodlands Regional Bus Interchange, located under the station.

Less than a year after the completion of the MRT project, the government announced in February 1991 their intentions to extend the system to Woodlands. Construction commenced in 1993, and the 16 km, 6 station elevated line was opened on 10 February 1996 at a total cost of S$ 1.2 billion. With this extension, the North South Line included the three stations on the former Choa Chu Kang Branch Line (Jurong East, Bukit Batok, Bukit Gombak and Choa Chu Kang), forming a continuous line from Jurong East to Marina Bay.

The construction of the extension was not without political fallout. For a long time, the politicians representing residences in the North-East area of the island had been calling for the construction of a planned North East Line. The announcement of the Woodlands Extension led to protests especially from opposition members of parliament, in particular from Chiam See Tong and Low Thia Khiang, representatives of Potong Pasir and Hougang constituencies respectively, with both areas potentially benefiting from such a line. The opposition members accused the government of favouring the Woodlands Extension over the North East Line due to opposition representation in the north-east area, arguing that there were far more residents in the north-east compared to the north, and questioned the rationale of building the Woodlands extension when the north was relatively undeveloped. Woodlands New Town was only half completed, and Sembawang New Town was still in the planning stage at that time.

More than a decade later, however, when the disputes with Malaysia over the railway land used by KTM escalated, it came to the fore that one of the criteria the Malaysian authorities had listed before they would consider shifting the existing railway station away from Tanjong Pagar was for the MRT system to be introduced to Woodlands. On 16 October 2003, in response to a question fielded in parliament, Professor S. Jayakumar, then Minister for Foreign Affairs, mentioned, that the Points of Agreement concluded between the two sides on 27 November 1990 included a clause stating that KTM will shift the station to a site adjacent or close to the Woodlands within five years from the day the MRT to Woodlands is opened, something the KTM only accomplished in 2011.

Considering that the Points of Agreement was made in the year 1990, and followed quickly by an announcement to build the MRT line a year later in 1991, there is a possibility that the line was given priority over the North East Line due more to international and local political concerns than economic considerations alone.

Expo station

File:Expo MRT.JPG

A C151 train at the platform of Expo MRT station.

Expo opened on 10 January 2001, sporting a "space age" architecture designed by world renowned architect Sir Norman Foster. The roof is clad in titanium and its design enabled the platform to be free of any columns, freeing up space in a station which will be used by thousands of visitors to the massive 100,000 square metre Singapore Expo next door.

Dover station

File:Dover MRT Station, Dec 06.JPG

Dover MRT station, the first MRT station to be built along an existing rail line.

Dover, built on the East West Line between the Clementi and the Buona Vista, was officially opened on 18 October 2001 by then Minister for Transport, Mr Yeo Cheow Tong. The first station to be built over an operating rail line with no disruptions to train services (although trains drove by the site at a reduced speed during the construction phase), it was also the first elevated station with two side platforms on either side of the tracks, as opposed to having an island platform as in all other elevated stations.

Adjacent to the Singapore Polytechnic on one side, and undeveloped land on the other, the building of the station was met with reservations by some members of the public over its low catchment area. There were criticisms over the spending of "taxpayers' money" chiefly for use only by students of one educational institution. The government proceeded with the construction anyway, citing the catchment area extends to public housing flats on either end of the polytechnic, and that the undeveloped land opposite is slated for extensive development, largely residential in nature. This station has indeed brought much convenience to the students at the polytechnic.

Changi Airport station

File:CG1 changi airport faregates.jpg

Faregates at Changi Airport MRT station.

For a long time following its opening in 1981, Singapore Changi Airport relied on taxis and buses as the primary means of public transportation to the rest of the country. They served the airport well, but concerns over competition from other regional airports, some of which feature quick rail-based services to their city centres, such as the one from Kuala Lumpur International Airport, accelerated the government's plan to build a rail link to the airport.

Provision had long been made for a new line branching off from the existing East West Line at the Tanah Merah, with some conceptual plans showing a tentative route alignment to the airport along Airport Boulevard, continuing beyond the airport to Changi point, before turning southwest back toward the city along the east coast of the island. When the extension to the airport was finally announced, however, the route alignment showed a deviation from previous plans.

The final plan involved building only the first two stations, namely Expo, an elevated station directly adjacent to the Singapore Expo, and Changi Airport, an underground station built between Terminal Two and the since constructed Terminal Three. The alignment of the station at the airport was switched perpendicularly to an East-west direction, such that stairs and escalators lead to two of the terminals directly from either end of the station.

Changi Airport was opened on 8 February 2002, giving the airport its first rail link after less than 21 years of operations. Initially through services were operated from the airport to Boon Lay at the other end of the East West line, however due to ridership falling below expectations the service was reverted to shuttle mode in 2003.

North East Line

File:Chinatown NEL Station, Entrance, Dec 05.JPG

The entrance to Chinatown MRT station at street level: the completion of the North East Line allowed the prominent ethnic neighbourhood of Chinatown to be connected by rail to the rest of Singapore's towns for the first time.

The North East Line, the first line operated by SBS Transit and among the first fully automated heavy rail lines in the world, opened on 20 June 2003. System problems delayed the line six months from the scheduled opening date of December 2002. The construction period of the North East line was fraught with many delays and some budget problems. It marked the pinnacle of a long and chequered history of over two decades since the conception of the line had taken place along with that of the original system which was eventually completed in 1990. As of May 2005, the line was still running at a deficit, and the line operator, SBS Transit, turns an overall profit because the profits from its public bus service exceed the losses from operation of the North East line. Running from HarbourFront where Singapore's former World Trade Centre building lies to Punggol to the northeast of the island, this line allowed for previously isolated or distanced areas to be linked up with the rest of Singapore by rail.

East West Line Boon Lay Extension

On 28 February 2009, the 3.8 kilometre Boon Lay Extension to the East West Line comprising 2 stations Pioneer and Joo Koon commenced passenger service.

Circle Line

On 28 May 2009, the 5.6 km of the Circle Line has been opened from Bartley to Marymount. On 17 April 2010, another 11.1 km of the Circle Line from Bartley to Dhoby Ghaut commenced operation. On 8 October 2011, the remaining 16.6 km from Marymount to HarbourFront, marking the full completion of the line that took 10 years to complete.

History of the system map

1987 to 1996

File:Singapore old mrt map.png

A recreated old MRT system Map used from 1987–1996

The MRT was a very recent addition for Singapore and as such, the authorities wanted to keep the MRT map as easy to use for Singaporeans as possible. Hence, each direction of travel was colour-coded in a different colour as though it were a line on its own. In that way, confusion in decision-making when taking a certain line in a certain direction would be reduced for passengers. However, this reduced the amount of colours available for new lines and was not in line with international practice.

Previously, each direction of travel on the MRT was denoted on system maps as a different colour.

  • Northbound services were denoted in Orange (since been given to the Circle Line)
  • Southbound services in red
  • Eastbound services in green
  • Westbound services in blue (since been given to the Downtown Line)
  • Northbound Choa Chu Kang Branch Line services in beige (may be given to Cross Island Line in the near future)
  • Southbound Choa Chu Kang Branch Line services in brown (since been given to the Thomson-East Coast Line)

Each station was also assigned a unique alphanumeric code, with the alphabet indicating which part of the island the station lies at (North, East, West, Central, Marina Bay region or Choa Chu Kang Branch Line) & the numbers (in ascending order from the centre of the island) indicating which part of that region the station is located at.

These were superseded in 2001 by two-digit codes as the latter might be exhausted with the MRT and LRT system, thus only having 15 letters in total.

1996 to 30 July 2001

The colour and alphanumeric codes for each direction of travel remained unchanged, except that with the opening of the Woodlands Extension (connecting Yishun station to Choa Chu Kang station), the Jurong East – Choa Chu Kang Branch Line ceased to exist. As such, the formerly Northbound Choa Chu Kang Branch Line services in khaki travelled southbound to Marina Bay & as such were denoted as red while the formerly Southbound Choa Chu Kang Branch Line services in brown originated from Marina Bay, hence having travelled northbound it was denoted as yellow. The alphanumeric codes for these stations were also replaced. Expo station which opened in 2001, was denoted by the code E13 for a short while. After Sembawang it is N14-N18, N20-N23, with the exception of N13 (Canberra) and N19 (Sungei Kadut). The N21-N23 were derived from the former B1-B3.

The Bukit Panjang LRT opened in 1999 and was given the colours purple and orange to represent its direction of travel. Due to the alignment of the route, which was a loop track around Bukit Panjang New Town, the map was different. The stations were given the alphanumeric code A1 to A14, with numbering starting from Choa Chu Kang interchange and going anti-clockwise direction on the loop. The directional arrow on the shared service track (between stations A1 to A6) was split, half purple coloured and half orange coloured. From Bukit Panjang station, the orange arrows travelled in an anti-clockwise direction [(service B) via Petir] while the purple arrows travelled in a clockwise direction [(service A) via Senja].

31 July 2001 to date

As there are plans to expand the network, the MRT System Map could no longer afford to have each direction of travel represented by a different colour. The map was revamped to have one colour as there will be more MRT lines in the future, which was announced by the Minister of Communications and Information Technology, Mr Yeo Cheow Tong. The pilot trials for new signages were done at Dover and at the North East Line.

Colours were used to represent each line rather than each direction of travel, cutting the usage of colours by half and preserving other colours for future lines.

History of station and train announcements

The on-board announcement system in every single SMRT train was introduced in 1994.[2] Over time, however, sections of announcements were modified, and finally, the entire announcement system was changed in January 2008. The new announcement system features a new voice, and a new chime before each announcement.

History of the ticketing system

1987 to 2002

When the MRT opened in 1987, fares ranged from S$0.50 to S$1.10 in S$0.10 increments for all adult tickets, regardless of whether they were single-trip or stored-value tickets.[3] Several discounted fares were available: senior citizens and permanent residents above the age of 60 could travel on a flat fare of S$0.50 during off-peak hours; children below the height of 1.2 metres and full-time students in primary, secondary, pre-university and vocational training (VITB) institutions paid a flat fare of S$0.30 at all times.[4]

Magnetic strip plastic tickets were used, in various forms. Stored-value tickets were called farecards and came in three types: the blue farecard was issued to adults, the magenta farecard to senior citizens, and the red farecard to children.[4] Single-trip forms of these tickets were retained at the faregates on exiting the paid area of a destination station.[5] Monthly discounted tickets were available in four values: beige, pink, and purple tickets for primary and tertiary students, and full-time national servicemen came with a value of S$13, S$30 and S$36, respectively;[6] the peach ticket was for secondary, pre-university and VITB students, costing S$17 each. These discounted tickets were valid for a month from the date of purchase, allowed up to four trips a day, and were non-transferable.[6]

2002 to 2009

Main article: EZ-Link

The EZ-Link card is a contactless smart card, initially based on Sony's FeliCa smartcard technology.[7] The cards are mainly used for the payment of transportation fares, but may also be used for payment at selected retail outlets. Established in 2002, the technology was promoted as the means for speedier and more convenient transactions[8] and as well as being an efficient method of reducing fare evasion, although there have been some cases of overcharging users.[9] As a benchmark, fares range from S$0.70 to S$3.20 for adults, S$0.70 to S$1.35 for senior citizens, and S$0.40 to S$0.50 for student EZ-Link cards. Patrons using an EZ-Link card receive a discount for their journey, including a discount if they use a connecting bus after their MRT ride.[10]

The General Ticketing Machines (GTMs) at each station which replaced the older ticketing machines, allow commuters to purchase additional credit to add to their EZ-Link cards or to purchase tickets for single trips. Fares for these single trip tickets are higher than those for EZ-Link cards. In addition, a S$1.00 refundable ticket deposit is charged for each Standard Ticket. This refund can be collected from any General Ticketing Machine so as long as the card is returned to the machine within 30 days of purchase.[11] The card can also be deposited into a charity collection box, with the S$1 deposit going to charity. The rationale behind such a refundable deposit feature was that the smartcard technology contained within each Standard Ticket makes each one costly enough to necessitate the recycling of Standard Tickets. Since November 2007, external readers were installed on GTMs at stations operated by SMRT Corporation to address problems of card jamming in insert slots. The slots, however, remain in use for the purpose of refunding Standard Ticket deposits.[12]

Concession fares are available for children, students, senior citizens and national servicemen. Students are given free personalised cards, complete with their photos, names and national identification numbers. Regardless of its type, each card is assigned a unique card ID that can be used to recover the card if lost. Transport operators have organised lotteries that are based on these card IDs. The Singapore Tourist Pass offers unlimited travel for tourists on Singapore's public transport system. For S$8 a day, tourists can take any number of rides on buses and trains operated by SBS Transit, SMRT Buses and SMRT Trains.[13] The old EZ-Link card can be used up to September 2009 where the old EZ-Link card usage would be discontinued.

2009 to date

Main articles: CEPAS

On 26 August 2008, Land Transport Authority announced a two-month trial of the new generation Contactless ePurse Application (CEPAS) card that was developed in-house.[14] It is intended to standardise the technology of cashless payment, allowing for use on public transport, Electronic Road Pricing (ERP), everyday shopping and meals. The card has replaced this generation of EZ-Link cards in 2009 and aims to encourage competition by allowing up to four CEPAS card issuers.[15] Mass replacement of the old Sony FeliCa cards to the new CEPAS cards went on at TransitLink Ticket offices and Singapore Post outlets till 7 October 2009.

Significant accidents and incidents

2011 disruptions

Main article: 2011 Singapore MRT disruptions

North East Line (NEL)

  • 15 March 2012 – Train services disrupted, between 6.30 am to 4.35 pm, on North East Line between Harbourfront and Dhoby Ghaut stations due to a power supply fault.[16]
  • 17 August 2012 – Train services along the whole stretch of North East Line disrupted due to a power supply fault and a subsequent signalling fault.[17] This was due to a broken U-bolt which caused train delays throughout the day.[18]
  • 10 January 2013 – Train services in both directions on the North East Line was disrupted due to a power fault, between 9.50 a.m. to 4.35 p.m.[19]

Financial penalties

The Land Transport Authority (LTA) intends to impose financial penalties amounting to S$400,000 on SBS Transit for the train service disruption along the North East Line on 15 March 2012.[20]

Circle Line (CCL)

Nicoll Highway collapse

Main article: Nicoll Highway collapse

The Nicoll Highway collapse was a construction accident that occurred at approximately 3.30 pm on 20 April 2004 in Singapore when a tunnel being constructed for use by MRT trains collapsed. The tunnel was part of the construction of the underground Circle Line, near the Nicoll Highway. The supporting structure for the deep excavation work failed, resulting in a 30-metre (100 ft) deep cave-in that spread across six lanes of Nicoll Highway. The collapse killed four people and injured three. The accident has delayed the construction end date for the MRT station.

Downtown Line (DTL)

Evans Road casualty incident

On 11 March 2012, a worker was killed at a site between Botanic Gardens and Stevens stations after a concrete slab fell on him. 35-year-old Masud Al Mamun was operating an excavator deep in the ground when the slab fell on him. Rescuers had to use a breaking tool kit to break a portion of the concrete slab. It took nearly five hours to reach the man lying motionless on the ground. This is the first casualty case in the construction of the Downtown Line.[21]

Bugis casualty incident

On 18 July 2012, two Chinese workers died after a temporary scaffolding, about four metres high, used for the construction of the new Downtown Line Bugis station subway link roof slab gave way. The incident happened at about 6.50 am. The eight other injured workers who were working on top of the structure, were sent to the nearby Raffles Hospital before rescuers arrived.[22]

On 22 August 2013, the main and sub-contractor Soletanche Bachy and Koh Brothers at the construction site were charged in court over the collapse. The two companies were said to have failed to take measures to ensure that the workplace was safe and without risks to health to every person within the premises on 18 July 2012.[23]

References

  1. Template:Cite journal
  2. MRT in the 1990s – SgForums.com
  3. Mass Rapid Transit Corporation, Singapore 1988, pg. 8–9
  4. 4.0 4.1 Singapore MRT Limited 1987, pg. 20–22
  5. Template:Cite conference
  6. 6.0 6.1 Singapore MRT Limited 1987, pg. 23
  7. Script error: No such module "citation/CS1".
  8. Sharp 2005, pg. 113–115
  9. Script error: No such module "citation/CS1".
  10. Script error: No such module "citation/CS1".
  11. Script error: No such module "citation/CS1".
  12. Script error: No such module "citation/CS1".
  13. Script error: No such module "citation/CS1".
  14. Script error: No such module "citation/CS1".
  15. Script error: No such module "citation/CS1".
  16. Script error: No such module "citation/CS1".
  17. Script error: No such module "citation/CS1".
  18. Script error: No such module "citation/CS1".
  19. Script error: No such module "citation/CS1".
  20. Script error: No such module "citation/CS1".
  21. Script error: No such module "citation/CS1".
  22. Script error: No such module "citation/CS1".
  23. Script error: No such module "citation/CS1".

External links

Template:Mass Rapid Transit (Singapore)